Tools for the Implementation of a SCADA System in a Desalination

Authors

  • José Ricardo Núñez Alvarez Universidad de la Costa

Keywords:

Automation, maintenance and quality control, product control and life cycle, programmable automata, integration and networks.

Abstract

In this work a system is designed and implemented in SCADA MOVICON 11.5, in which the operation of five seawater desalination lines by reverse osmosis which work in parallel, with four coastal wells and two end-of-line pumps of the permeated water obtained are integrated, synchronized and supervised as a single plant. Each desalination line has its own control system and can operate independently. As a product, synchronization algorithms were obtained that were added to the system through script codes, which guarantee productive continuity in the desalination process, achieving synchronization between the mentioned sub-processes. Simultaneous operations of starting, washing and stopping that affected the performance of the osmosis lines are avoided. Alarms are generated, reports are created, historical records and trends for the decision making on prediction of failures, predictive maintenance and troubleshooting.

Downloads

Download data is not yet available.

Published

2019-12-17

How to Cite

Núñez Alvarez, J. R. (2019). Tools for the Implementation of a SCADA System in a Desalination. IEEE Latin America Transactions, 17(11), 1858–1864. Retrieved from https://latamt.ieeer9.org/index.php/transactions/article/view/1686